Results 1 to 2 of 2

Thread: Tubing L80 and downhole completion P110

  1. Tubing L80 and downhole completion P110

    Good day,
    I have a question but if it possible I'd like to have response as soon as possible , my question is can I make up tubing with grade 3"1/2 9.2#L80 13% Cr with downhole completion 3"1/2 9.2# P110 13%Cr
    thank you for yout help


    See More: Tubing L80 and downhole completion P110
    Last edited by sara_nazim; 02-28-2020 at 04:31 PM.

    My threads; sara_nazim :


  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. Re: Tubing L80 and downhole completion P110

    Yes of course, but you need to cross the make up torq with maximum of L80 and minimum of P110

    My threads; fish282 :


    •    Sponsored Links



      -

    Similar Threads

    1. Replies: 0
      Last Post: 04-12-2016, 08:18 AM
    2. Trough tubing bridge plug, Liner 5", Tubing 2 3/8"
      By meisterkla in forum Drilling And Workover
      Replies: 1
      Last Post: 03-26-2014, 02:24 AM
    3. Downhole sizes
      By willow in forum Drilling And Workover
      Replies: 3
      Last Post: 12-04-2013, 05:55 AM
    4. Hovoy GRE tubing casing and tubing
      By franklinshih in forum Pipeline And Fluid Flow
      Replies: 0
      Last Post: 05-30-2011, 03:44 PM
    5. Downhole tools
      By bouha in forum Drilling And Workover
      Replies: 0
      Last Post: 03-28-2008, 01:20 AM

    Bookmarks

    Posting Permissions

    • You may not post new threads
    • You may not post replies
    • You may not post attachments
    • You may not edit your posts
    •