Hello Everyone,

I have recently started project that requires electrical interlocks using IEC 61850 communication protocol.

One of the cases, an electrical interlocking have to be configured between two separate substation over Goose messaging. (Two IEC 61850 Stations)

Has anyone done similar configuration before?
Is there any sources or tutorial that can guide me for the configuration?

Current Configuration:

Both Station are in the same network (For the purpose of goose messaging)

I have Siemens Siprotec 5 (7SD82, 7SJ82) relays with the latest firmware V7.9

Station-A It has two outgoing feeders that energize Station-B

Station-B The two incoming relays in this station

Thanks in advance


See More: IEC-61850 Ed.2 Goose Messaging between two station