Dear Term,
I think you are busy. We are waiting for your eclipse training (rest chapters)
Thanks
Dear Term,
I think you are busy. We are waiting for your eclipse training (rest chapters)
Thanks
Dear All, i was out for the buissness reasons soon i will start again just need more time for finishing several stuff on my side
Take care
to All.
I need help in translation one of the document in Arabic to English
will appritiate any help
[link Point to another website Only the registered members can access]
Almost a day pass no help (((
i'm a new user, thanks for ur upload
Hello Fiends in Arabic countries, please help Temr
The work he has done in this thread is valueless, so a bit of help here would be really really nice.
Temr I will try a friend of mine who works in SA and perhaps one of his Arabic friends might help. No promises but I will try.![]()
Regards
“Considering the many productive uses of petroleum, burning it for fuel is like burning a Picasso for heat.”
—Big Oil Executive
Shakespear - Thanks a lot for support you back me to the life
@ temr!
you are doing a great job to guide us who r new in using Eclipse.
Ehsan Ali
(2006pet28@student.uet.edu.pk)
Univ. of Engg. and Technology,
Lahore, Pakistan.
I hope this would help
------------------------------------------------------------------
Ratawy reservoir checking :
Descending production tubing of 2 7/8 inches till the bridge ending and checking the top of the bridge plug at 3503 m with 2 tons.
Removing the completion mud by fresh water, checking the bridge with a pressure of 1500 psia.
Hanging the production tubing at 3473 m and putting the charismas’ tree .
Making the perforation (3482-3488 m) with ceramic shots ,1 11/16 inches -density 13shots/m .The tubing head pressure raised immediately to 600 psia, opening the well to flowing 100l/min.
Continuing the well production and clean-up (very viscous oil).
Acidizing the perforations mentioned above with acid( HCL 12% HF 3%)(circulating pressure 3600 psia and injection rate 400l/min).
Opening well for clean-up. Measuring well rates with different choke sizes.
Closing well for build-up. killing the well with a 1.25 gm/cc brine and a ½ inch choke and controlling the well.
Putting and checking the 9 inches BOP.
Pulling the production tubing, and setting a bridge plug (BP)at 3453m to isolate perforations.
Descending again the production tubing to check the BP, after that the tubing was pulled till 2600m and a cement plug was set and verified at 2513m.
Removing the brine by sodium chromite .
Controlling the well, hanging the production tubing at 2300m , putting charisma's tree and checked with a 6500 psia.
Moving the rig to another location.
----------------------------------------------------------------------
Last edited by halim78; 11-01-2009 at 11:10 AM.
halim78 ,Asalem Alekum!
Thank you for you help
Keep helping and may be you will change the world
Take care
Temr
Real big thank to halim78. The translation was very helpful in my current project.
Hi Temr, Thank for help us.
Excellent Tutorial.
Temr Do you have a tutorial related with double porosity model in Eclipse? the data file structure, etc.
Please post something like related.
Thank you friend!!!
Bookmarks