can some on provide ISO 28921 - 1& 2
Thanks.
Dear Gent can you share the latest edition of the below?
Tks in advance
mike
1. API 5L2 1987 Internal Coating Line Pipe
2. API 5L7 1988 Internal FBE of Line Pipe
3. API 5LIP 1st Ed. [Pub Date] Draft - Specification for Induction Bends - ISO 15590-
4. API 526 2009 Flanged Steel Pressure relief valve
5. API 547 2005 General-purpose Form-wound Squirrel Cage Induction Motors - 250 H
6. API 579-1 2007 Fitness for service ASME_FFS-1_2007
7. API 590 1985 Steel line blanks
8. API 599 2002 Metal Plug Valves flanged Threaded and Welding Ends
9. API 613 2003 Special Purpose Gear Units
10. API 614 2008 with May 2008 Errata - Lubrication, Shaft-sealing and Oil-control Systems and Auxiliaries -
11. API 1157 1998 Hydrostatic Test Water Treatment and Disposal
12. API 1160 2001 Managing-System-Integrity-for-Hazardous-Liquid-Pipelines
13. API RP 500 2002 recommended practice for classification of locations for electrical installations of
14. API RP 500 Electrical recommende practice for classification of locations for electrical installations of petroleum
15. API RP 552 1994 Transmission Systems
16. API RP 553 1998 Refinery Control Valves
17. API RP 686 2009 Machinery Installation and installation design 2009
18. API RP 1109 (1993 Marking Liquid Petroleum Pipeline Facilities
19. API RP 1117 1996 Movement of In Service Pipelines
Dear Gent can you share the latest edition of the below?
Tks in advance
mike
1. API 5L2 1987 Internal Coating Line Pipe
2. API 5L7 1988 Internal FBE of Line Pipe
3. API 5LIP 1st Ed. [Pub Date] Draft - Specification for Induction Bends - ISO 15590-
4. API 526 2009 Flanged Steel Pressure relief valve
5. API 547 2005 General-purpose Form-wound Squirrel Cage Induction Motors - 250 H
6. API 579-1 2007 Fitness for service ASME_FFS-1_2007
7. API 590 1985 Steel line blanks
8. API 599 2002 Metal Plug Valves flanged Threaded and Welding Ends
9. API 613 2003 Special Purpose Gear Units
10. API 614 2008 with May 2008 Errata - Lubrication, Shaft-sealing and Oil-control Systems and Auxiliaries -
11. API 1157 1998 Hydrostatic Test Water Treatment and Disposal
12. API 1160 2001 Managing-System-Integrity-for-Hazardous-Liquid-Pipelines
13. API RP 500 2002 recommended practice for classification of locations for electrical installations of
14. API RP 500 Electrical recommende practice for classification of locations for electrical installations of petroleum
15. API RP 552 1994 Transmission Systems
16. API RP 553 1998 Refinery Control Valves
17. API RP 686 2009 Machinery Installation and installation design 2009
18. API RP 1109 (1993 Marking Liquid Petroleum Pipeline Facilities
19. API RP 1117 1996 Movement of In Service Pipelines
Last edited by Mikepehli; 02-26-2016 at 10:09 AM. Reason: Any feedback please? m
Api rp 5l2 (r2007)
Any feedback please?
m
Hi, can you share please API RP 5LW 2009 (R2015)?
Many thanks
If you had the 2009, there are no changes, I have added the REAFFIRMED, MAY 2015 to my copy. What happened to the ASTM access?
API RP 5LW 3rd Sept. 2009 R2015 Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels
Dear Gent can you share the latest edition of the below?
Tks in advance
mike
1. API 5L2 1987 Internal Coating Line Pipe
2. API 5L7 1988 Internal FBE of Line Pipe
3. API 5LIP 1st Ed. [Pub Date] Draft - Specification for Induction Bends - ISO 15590-
4. API 526 2009 Flanged Steel Pressure relief valve
5. API 547 2005 General-purpose Form-wound Squirrel Cage Induction Motors - 250 H
6. API 579-1 2007 Fitness for service ASME_FFS-1_2007
7. API 590 1985 Steel line blanks
8. API 599 2002 Metal Plug Valves flanged Threaded and Welding Ends
9. API 613 2003 Special Purpose Gear Units
10. API 614 2008 with May 2008 Errata - Lubrication, Shaft-sealing and Oil-control Systems and Auxiliaries -
11. API 1157 1998 Hydrostatic Test Water Treatment and Disposal
12. API 1160 2001 Managing-System-Integrity-for-Hazardous-Liquid-Pipelines
13. API RP 500 2002 recommended practice for classification of locations for electrical installations of
14. API RP 500 Electrical recommende practice for classification of locations for electrical installations of petroleum
15. API RP 552 1994 Transmission Systems
16. API RP 553 1998 Refinery Control Valves
17. API RP 686 2009 Machinery Installation and installation design 2009
18. API RP 1109 (1993 Marking Liquid Petroleum Pipeline Facilities
19. API RP 1117 1996 Movement of In Service Pipelines
Hi Marty, i don't know but i'm searching a new access everyday, when i have news you will know first![]()
API RP 941 8th Feb. 2016 Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants