<

Results 1 to 12 of 292

Thread: Etap 14

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1

    Re: Etap 14

    Another thing is if you create a file in a crac.ked version, work on it, and later is opened in an original version. ETAP original version tell to ETAP's servers that you are working with a pirate version on a specific IP, Server, company, city, country, user and SO. An ETAP communicate letter will arrive to your company. the same case is for PLS-CADD.

  2. #2

    Re: Etap 14

    ....................
    Last edited by cadguy; 05-13-2016 at 04:00 AM.

  3.    Sponsored Links



    -

  4. #3

    Join Date
    Nov 2010
    Location
    Sweden
    Posts
    768

    Re: Etap 14

    ................
    Last edited by raz; 05-17-2016 at 04:15 PM.

Similar Threads

  1. Etap 12.6
    By shengna in forum Electrical & Power Engineering
    Replies: 367
    Last Post: 03-08-2017, 05:09 AM
  2. Etap 11.0
    By maximiliano_capote in forum Electrical & Power Engineering
    Replies: 3
    Last Post: 02-09-2015, 10:39 AM
  3. ETAP 11 and !2
    By fx007 in forum Electrical & Power Engineering
    Replies: 15
    Last Post: 04-05-2014, 05:35 PM
  4. Need etap --------
    By EHABEZZEDEN in forum Electrical & Power Engineering
    Replies: 1
    Last Post: 02-12-2012, 09:33 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40