we have installed a double mechanical seal by Eagle burgamann on a process pump having flush plan 11+ 52+ 61.
For plan 52, reservoir cooling water connections , we haven't recieved the Eagle burgamann drawing. So for reservoir "cooling water in" and cooling water out" lines , we used Eagle burgmann latest flush plans pocket book as refrence & installed lines.
But now,we recieved reservoir drawing, and it shows we have made opposite connections.
Do we have to replace the connections or we can use it the same way?