I'd like to add manual for PE107 Production Rate Decline Curves. I hope dear abdulghaffar will upload this video in the future.[link Point to another website Only the registered members can access]
I'd like to add manual for PE107 Production Rate Decline Curves. I hope dear abdulghaffar will upload this video in the future.[link Point to another website Only the registered members can access]
7-gas lift (pe105)
[link Point to another website Only the registered members can access]
Sorry for the delay, i uploaded the movie from month ago but i forget put here.
Last edited by abdulghaffar; 10-10-2014 at 03:31 PM.
pl upload more videos. thanks in advance
Brother Abdul Ghaffar, please upload more training especially PE 107 Decline Rate, PE 402, Gas Well Testing, PE 507 Reservoir Simulation
hi brother abdul ghaffar , please upload the films again all of the link expired
Dear abdulghaffar,
Please post any videos about Drilling.
Otherwise many thanks for the good work done so far.
Cheers
Gitta
Dear abdulghaffar,
Please post any videos about Drilling.
Otherwise many thanks for the good work done so far.
Cheers
Gitta
abdulghaffar plz upload again the link of Well Completion Design & Practices (PE 301 )
hi
can anyone please upload [ ihrdc : Well Completion Design & Practices (PE 301 ) ] again. also if anyone has the manual for it. please share
Last edited by owaisahmed_petro; 02-18-2017 at 08:40 PM.
I will get back to you very soon to resume uploading....
Many thankss
Bookmarks