<

Results 1 to 4 of 4

Thread: Developement strategy in petrel

  1. Developement strategy in petrel

    Dear R.E.
    I want to create a new developement strategy in petrel RE for Historical and prediction
    What rules I schould choose? for a natural depletion.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Join Date
    Jan 2009
    Location
    ALA, KZ
    Posts
    436

    Re: Developement strategy in petrel

    Well, depend where you are ...
    If you are from the region where goverment controls licence holders then you need to obbey the state rules ( for example do not drop reservoir pressure below buble points etc)
    Otherwise you main strategy is to maximaze you recovery factor and minimize you operational and capital costs to do this you need to follow several steps.
    1. Create Netthickness map form petrel ( above you OWC ). This map then can be used to juctify future well candidates ( first you will put wells on sweet spots)
    2. Create 1 additional countour ( we call it pure oil zone , geometrically this countour will show you the place where you do not have moovable water, since if you will put the well in oil-water zone the well will start rapidly produce water)
    3. culculate the drinage area ( based on you well test data) and make a well pattern such a way that you can cover all field.
    So you done with a reference case.
    No you can create 2 variation with less wells and 2 variation with higher ammount of wells.
    So you have 5 cases and you can put them to simulator and get simulation results, or you can use analitical model to jenerate production profiles.
    Calculate economics and range the cases , the main goal is maximise your NPV and IRR.
    This steps are jeneral and can be used on any filed

  4.    Sponsored Links



    -

  5. Re: Developement strategy in petrel

    thank you very much Mr temr

  6. Re: Developement strategy in petrel

    HI , Can any one suggest development strategy for maximum recovery and wells model in petrel and simulator is eclispe100 - I dont know how and which parameters to fill in the prediction/depletion and water injection prediction rules. Here is the link to the model i am working, I have basic idea of how petrel works since I am very new to petrel and eclipse (gives me convergence problem), any help will be appreciated.
    Here is the link to the model:

    [link Point to another website Only the registered members can access]


  •   

Similar Threads

  1. Honeywell Strategy
    By knight282011 in forum Planning & Project Management
    Replies: 0
    Last Post: 09-17-2012, 10:25 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •