<

Results 1 to 10 of 10

Thread: CSG/CBM -Ash and Moisture lab interpretations

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #3

    Re: CSG/CBM -Ash and Moisture lab interpretations

    Quote Originally Posted by ruhtra View Post
    Hi Terrya,

    you need to check on what basis of ash/moisture has been done. In general ash/moisture will be on air dried basis whereas ash/ moisture will be done at equilibrium moisture basis.

    Hope this help.

    Arthur
    Hi Arthur,

    Yes I understand the difference of both but my question is that which one is more accurate? One needed for Reservoir condition and the other one is not.
    Last edited by terrya; 07-31-2014 at 11:54 AM.

Similar Threads

  1. ASME Interpretations
    By manikumaran1978 in forum Oil And Gas Production
    Replies: 36
    Last Post: 05-09-2017, 08:59 PM
  2. Api 653 interpretations
    By atiflodhra in forum Mechanical Engineering
    Replies: 0
    Last Post: 07-30-2013, 09:27 AM
  3. ASME Code interpretations
    By math in forum Mechanical Engineering
    Replies: 1
    Last Post: 06-14-2013, 07:58 AM
  4. Steel for a fume economizer with 2 ppm SO3@ 18% moisture.
    By webcba in forum Mechanical Engineering
    Replies: 0
    Last Post: 05-21-2013, 11:52 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40