Hi all,
I'm currently doing a PTA in a slanted development well completed in gas cap of a near critical reservoir. The well was first cleaned up and then ramped up when it was connected to the production facility and then well was closed for pressure build.
During the well clean-up on successive chokes for a total production of 46 MMSCF a drop of 7 psia was observed in the permanent gauge installed. The well produced at a CGR of about 40 bbl/MMSCF. Also pressure had dropped by 15 psia when compared to start of clean-up and start of ramp-up. There is also one well about 300 m away from this well completed in the gas-cap. The present well has a stand-off of about 120m from the GOC.
some of the points are
1. When I make an IPR from C&n and Forchheimer, there is a difference by a factor of about 2.5 times.
2. When I make my IPR of multi-rate during clean-up, does taking pressure at equal time-steps would give a better result?
3. What to expect from a PTA of slant-well?
4. How do I incorporate the decreasing pressure and how it would affect my analysis?
5. The permanent gauges are about 60 m above the reservoir entry point. How will falling liquid level would affect my BU response?
Sorry for my long post.