According to degree of wet and dry mill materials,

[link Point to another website Only the registered members can access]

Wet Ball Mill lifting process considerations are as follows:

1. During the installation haul rail beam platforms to consider wet ball mill cylinder placement point. Track beam axis must highlight the process floor to the outside wall. The projecting portion of the length of the cylinder must be greater than 2/3, so that the crane makes the ball mill cylinder in rail beam.

2. Haul rail beam welding and mobile platforms structure must firmly anchor set to be reasonable.

3. Hauling process should pay attention to track beam deformation, settlement and other issues.

4.Ball Mill hanging point set should be reasonable and should produce four special lug arranged on the cylinder, in order to meet the lifting process of lifting angle of not less than 45 degrees.

5.Wet Ball Mill lifting the shift process to ensure that the level of the cylinder, while the construction workers during construction should be in the side of the barrel, is prohibited on the bottom and sides of the stations of the cylinder, ensure that the process of construction safety.

The wet ball mill can be handled with water and mud containing high quality ore. Choose don't low-grade magnetic iron ore, wet ball mill is easy to obtain any of the required size, and can be adapted by magnetic separation, to reduce moisture; air facilities have increased, so that makes the dry ball mill investment and production costs are increased. Choose low-grade magnetic iron ore, wet ball mill is easy to obtain any of the required size, and can be adapted by magnetic separation.