    hi

    im asking how to simulate for preloop from the field to Process Interface Bldg. (PIB) or DCS this instrument : the tools we been use was Hart Communicator 375,LC 100 Martel , Druck 300 DPI603 , Ametek 7975 Hand pump , megger , TK3 and can you give a drawing the typical setup of each instrument to calibrator to simulate the preloop ?im appreciate those who will help me. and how to use the calibrator to simulate the instrument


    H2s gas detector
    combustible Gas Detector
    Corrission XMTR and Access Fitting CM
    BEACONS
    HORN

    TRANSMITTER HART / ANALOG

    Corrission Transmitter
    DP Flow Transmitter w/ ventury
    Rotameter Transmitter
    Analyzer Indicator Transmitter
    Agar Level Transmitter
    Vibration Transmitter
    Intensity Current Transmitter
    Magnetic Flow Meter
    Remote Level Indicator
    Remote Temperture Indicactor
    Temperature Indicator Transmitter
    Analyzer Indicator Transmitter
    Agar Level Transmitter
    DP Level Indicator Transmitter
    Vibration Transmitter
    DP Level Indicator Transmitter
    Temperature Indicator Transmitter


    TRANSMITTER FIELDBUS

    Corrission Transmitter Fieldbus
    DP Flow Transmitter w/ ventury Fieldbus
    Rotameter Transmitter Fieldbus
    DP Level Indicator Transmitter Fieldbus
    Guide Wave Radar Level Transmitter Fieldbus
    Analyzer Indicator Transmitter Fieldbus
    Agar Level Transmitter Fieldbus
    Vibration Transmitter Fieldbus - FFVMS Trend master 2000/ Velocity Seismo Probe
    Intensity Current Transmitter
    Magnetic Flow Meter Fieldbus
    Remote Level Indicator Fieldbus
    Remote Temperture Indicactor Fieldbus
    Temperature Indicator Transmitter Fieldbus
    Analyzer Indicator Transmitter Fieldbus
    Agar Level Transmitter Fieldbus
    DP Level Indicator Transmitter Fieldbus
    Vibration Transmitter Fieldbus
    Temperature Indicator Transmitter Fieldbus
    Termocouple Temperature Transmitter
    RTD Temperature Transmitter

    CONTROL VALVE

    ON OFF Deluge Valve
    Level control valve Fieldbus
    Hand Control Valve Fieldbus
    Temperature Control valve Fieldbus
    Pressure Control Valve Fieldbus
    Level Control Valve Fieldbus
    MOV FF
    AOV FF



    SWITCH

    Pressure Switch
    Level Switch
    Temperature switch
    Flow Switch
    Pig tail

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. Re: For PRe Loop Checking

    is there anybody give some idea?this is my email address trp_acservices@yahoo.com

  4.    Sponsored Links



    -

Similar Threads

  1. Loop Checking
    By selmagis in forum Electrical & Power Engineering
    Replies: 7
    Last Post: 12-25-2013, 11:05 PM
  2. loop checking
    By cytech in forum Instrumentation & Control
    Replies: 0
    Last Post: 06-01-2013, 06:24 PM
  3. fieldbus loop checking
    By kuo in forum Instrumentation & Control
    Replies: 0
    Last Post: 04-07-2013, 07:48 AM
  4. isa loop checking
    By kuo in forum Instrumentation & Control
    Replies: 0
    Last Post: 01-11-2013, 12:40 PM
  5. Loop checking: A technician guide
    By massimo in forum Instrumentation & Control
    Replies: 1
    Last Post: 04-13-2011, 04:02 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40