hey everyone, these are some drilling problems that I can't fiind a solution to:
1. Drilling 12.25" hole section to depth 10,450ft in gas well had pressure dropped 500 psi while drilling Sand interval and unexpected fast break, the rest of the section TD is 60ft and ROP still high.
2. Drilling 12.25" hole section to depth 16,500ft, bit type in hole was insert bit IADC617, total bit drilling hours 110hrs, Bit specification sheet mentioned the recommended working hours not exceed over 95hours, still in progress to complete section to Casing point to depth 16,550ft, Rop was 5 ft/hr and in the last 10 hrs Rop was 2.7 ft/hr.
3. While drilling deviated well with inclination 55 degrees using PDC bit had rate of penetration dropped from 20 ft/hr to 1.5ft/hr , hole size 12.25” and reached drilling depth 8,790ft (dog leg 4.5 /100ft) Torque off bottom=14,500 ft .lb ,Torque on bottom=14,510 ft.lb, …. Give what your indication about the slowdown in ROP and risk evalution to continue with consideration offshore rig (Cost/hr. =12,000 & Tripping time 1000ft/2.5hr).
Any help will be helpful...Thanks



Reply With Quote

Bookmarks