PROCESS EVALUATION:
general process Evaluation:
this evaluation based on shaw group Criteria :
i) Side by side versus stacked design
ii) Differences in reformate/hydrogen/light ends yields
iii) Catalyst deactivation and attrition
iv) Ease of maintenance of side by side design
v) Reduced plot plan area requirement of stacked design
and over all process evaluation:
this based on JGC Criteria
(1) Products yields and qualities
(2) Utility consumption
(3) Catalyst consumption (if any)
(4) Equipment size and/or capacity
(5) Royalty and engineering fee
(6) Investment cost





Reply With Quote

Bookmarks