<

Results 1 to 2 of 2

Thread: FGS System Lay Out for Gas Trrbine & Cogen Plant

  1. #1

    FGS System Lay Out for Gas Trrbine & Cogen Plant

    Dear All,

    I am working out for FGS lay out of NG Gas Turbine Cogen Plant. Basically peripherial area shall be provided with LOS, path detector and leakage points shall be provided with point detector. Since I am not familiar with gas turbine and I don't have reference, it is not clear for me to identify the total numbers of leaked potential points in gas turbine. NFPA 850 can not be referred for such particular requirement.
    Any one who has practically involved in similar project please advise to me. Reference FGS lay out is also good start point for me to understand the basis behind, don't make me wrong I don't have any intention for blind copy without basis.

    Best Regards

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2
    Maybe you'll get some ideas here:

    [link Point to another website Only the registered members can access] and here:

    [link Point to another website Only the registered members can access]


  4.    Sponsored Links



    -

  •   

Similar Threads

  1. Overall Plant IT System
    By Elnar in forum Petroleum Club
    Replies: 1
    Last Post: 05-23-2012, 09:33 PM
  2. Replies: 0
    Last Post: 09-25-2011, 10:48 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •