Hi All , i urgently need help wit some electrical design. its a 2-storey containing 7 apartments. one main panel board serving the seven consumer units, a backup generator set for the whole building, manual changeover switch. wat wiring design can ensure the meter does not read when you change supply to the generator, that is i do not want to do the double wiring bcos of cost.
Pls gurus, help, the proj is ongoing
regards,
kebian



Reply With Quote


Bookmarks