hi sir
i mean
During the drilling and circularisation of the mud when I got the following problem at depth 1050 m Loss of mud circularisation rate of 10 cubic meters per hour
Question
How can we calculate the amount of pore and fracture pressure at this depth in order not to be exceeded when an operation cementing well to the same previous problem
mud weigth = 1.12 g/cm3
flow rate = 1.2 m3/min
circularisation pressure = 200 psi
Depth =1050 m
open hole =12.250 in






Reply With Quote

Bookmarks