<

Results 1 to 11 of 11

Thread: negative OIIP result from MBE

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    dear Chee Hoh Peh

    I really appeciate your help regarding my question.
    I'll check my pressure data with your comment & reference book.

    I've another question calculating averaged reservoir pressure in multi-wells reservoir(All wells have a communication each other.)
    I heard about the method, volume averaged pressure,
    but each well production start time is different, so cumulative productions were also different.
    Would you recommend me any reference books or ducuments for calculating averaged reservoir pressure, once more??

    regards,
    sharpjiy

  2. #2

    Join Date
    Aug 2010
    Location
    Jakarta, Perth & Kuala Lumpur
    Posts
    39
    Dear Sharpjiy,

    See Dake - "The Practice of Reservoir Engineering", he has excellent worked examples and discusses in depth how to average reservoir pressure.

    Your reservoir pressure is an average of well SIBHP, usually obtained by PTA.

    Do not worry about well timing, what you need is average reservoir pressure and total fluids (gas/oil/water) produced at each average reservoir pressure point.

    Rgrds

    Chee Koh Peh

  3.    Sponsored Links



    -

  4. #3
    Take a look at this paper

    [link Point to another website Only the registered members can access]

    Also this one is good

    [link Point to another website Only the registered members can access]

    Last edited by Shakespear; 10-25-2010 at 04:03 PM.
    Regards

    “Considering the many productive uses of petroleum, burning it for fuel is like burning a Picasso for heat.”
    —Big Oil Executive

  5. #4
    Dear Shakespear

    Thank you for your help, shakespear.
    The documents you recommended were really helpful for me.
    And, I was also impressed your last comment, petroleum should be used as a meterial not as a fuel.
    I totally agree with you.

    Regards
    sharpjiy

  6. #5
    Dear Chee Koh Peh

    Thank you for your answer, Mr. Chee.

    When I was a student, I just run how to calculate reserve with MBE, or volumetric, decline curves.

    But in real works, the problem was how to set input data for reserve estimation.

    Calculation itself was conducted many software or other tools.

    Your comments and references would be great help for me.

    thank you.

    regards
    sharpjiy

  7.    Spons.


  •   

Similar Threads

  1. Replies: 7
    Last Post: 03-01-2014, 11:45 AM
  2. Negative WOB!!!!1
    By suresh.upes11 in forum Drilling And Workover
    Replies: 1
    Last Post: 11-02-2013, 09:59 PM
  3. Article: negative OIIP result from MBE
    By sharpjiy in forum Home Articles
    Replies: 0
    Last Post: 01-14-2011, 10:29 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •