I think that if the pressure window is too small , then it is better to use managed pressure drilling technique that apply back pressure if the mud pumps are stopped while making new connections.
I think that if the pressure window is too small , then it is better to use managed pressure drilling technique that apply back pressure if the mud pumps are stopped while making new connections.
Finally and after five years I become a petroleum engineer.actually semi-engineer
Yeah great idea, we should have a separate chapter or thread for it...
add me as a member.
my email id is nizam_nedian@yahoo.com
thanks for your reply
i work in drilling company and im material advisor (trainee)
what u advise me to do to be specialist in drilling equipments.
plz i need your advise since no body wants to guide me in my company i dont know why ???
plz ur help needed and will be highly thankfull.
thanks for your reply
i work in drilling company and im material advisor (trainee)
what u advise me to do to be specialist in drilling equipments.
plz i need your advise since no body wants to guide me in my company i dont know why ???
plz ur help needed and will be highly thankfull.
I am abdulrehman working in Pothowar region Pakistan for last four ears as a drilling engineer...............we have the same problem of balooning. due to abnormally high pressures in this area, we have to drill with very high mud weights (upto 19.5 ppg) and after shutting off the pump, te well starts flwing at high rate and gradually becomes stable after 30-80 minutes depending upon the length of open hole.....I think, Managed pressure drilling is a good technique to cope with this problem.
must know the methods of calculating the rig (mast-drawworks-drill string design......), and also know the API spec and API RP.
must know how to establish a drilling program and how to choose a rig.
I can't understand what you have written........the text is either incomplete or something else as it is difficult to understand what you wanna say
download all the books, I just load them, it'll help you
All books "Started by BOUGHELOUM"
All,
we will conduct drilling activities in the middle of residential, does anybody know how to reduce the effects of heat, noise and illumination from the burn pit ?
Bookmarks