<

Page 2 of 2 FirstFirst 1 2
Results 13 to 24 of 24

Thread: I have an idea.

  1. #13
    I think that if the pressure window is too small , then it is better to use managed pressure drilling technique that apply back pressure if the mud pumps are stopped while making new connections.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     
  3. #14
    Finally and after five years I become a petroleum engineer.actually semi-engineer

  4.    Sponsored Links



    -

  5. #15
    Yeah great idea, we should have a separate chapter or thread for it...
    add me as a member.
    my email id is nizam_nedian@yahoo.com

  6. thanks for your reply
    i work in drilling company and im material advisor (trainee)
    what u advise me to do to be specialist in drilling equipments.

    plz i need your advise since no body wants to guide me in my company i dont know why ???
    plz ur help needed and will be highly thankfull.

  7. Quote Originally Posted by BOUGHELOUM View Post
    essalamo ala man itabaa elhoda

    I work for a drilling company and I'm 9 years experience in drilling equipment
    thanks for your reply
    i work in drilling company and im material advisor (trainee)
    what u advise me to do to be specialist in drilling equipments.

    plz i need your advise since no body wants to guide me in my company i dont know why ???
    plz ur help needed and will be highly thankfull.

  8.    Spons.


  9. Same Problem

    I am abdulrehman working in Pothowar region Pakistan for last four ears as a drilling engineer...............we have the same problem of balooning. due to abnormally high pressures in this area, we have to drill with very high mud weights (upto 19.5 ppg) and after shutting off the pump, te well starts flwing at high rate and gradually becomes stable after 30-80 minutes depending upon the length of open hole.....I think, Managed pressure drilling is a good technique to cope with this problem.

  10. #19
    must know the methods of calculating the rig (mast-drawworks-drill string design......), and also know the API spec and API RP.

    must know how to establish a drilling program and how to choose a rig.

  11. I can't understand what you have written........the text is either incomplete or something else as it is difficult to understand what you wanna say

  12. #21
    download all the books, I just load them, it'll help you

  13. Quote Originally Posted by BOUGHELOUM View Post
    download all the books, I just load them, it'll help you
    hiz man
    which books

  14. #23
    All books "Started by BOUGHELOUM"

  15.    Spons.


  16. Drilling in the middle of residential

    All,

    we will conduct drilling activities in the middle of residential, does anybody know how to reduce the effects of heat, noise and illumination from the burn pit ?

Similar Threads

  1. Any IDEA for CAESAR?
    By gpp1981uk in forum Pipeline And Fluid Flow
    Replies: 1
    Last Post: 01-23-2014, 08:55 PM
  2. anyone have an idea about LPT? for the Fig Threads
    By tonyliao in forum Mechanical Engineering
    Replies: 0
    Last Post: 08-07-2013, 01:50 AM
  3. Replies: 1
    Last Post: 03-18-2012, 01:49 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40