<

Results 1 to 3 of 3

Thread: integrator step size and calculation execution rates hysys

  1. integrator step size and calculation execution rates hysys

    Hello everyone!
    I'm working on a dynamic simulation in hysys !!!...I simulate a batch distillation...i'm using the default value of integrator step size and maximum (in the integrator tab).the simulation is highly unstable and are not respected material and energy balances!!!!!...can anyone tell me how to change the default value ?????
    thanks in advance
    p.s. sorry for my english
    Last edited by marchese85; 09-08-2010 at 10:28 AM.

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2
    Hi marchese85
    When you have these type of problems the best thing is to reduce first to 1,2,2,5 and also the time step to 0.25 seg if it persists then go to 1,2,2,2 and also 0,25 then to 1,1,1,1 and 0,1 if it persists for a batch distillation then it is because you have something ill defined.

    Regards
    Juan

  4.    Sponsored Links



    -

  5. Hi juan
    Thank you so much....a last question ... Can i set the maximum value in the integrator tab at 20 seconds or even this must be reduced ?????
    sorry for my english
    best regards

Similar Threads

  1. Bulk Modulus Calculation using Aspen HYSYS
    By a_bhoir in forum Oil And Gas Process
    Replies: 1
    Last Post: 02-24-2014, 01:49 PM
  2. Reactor vent size calculation
    By kishorekolli in forum Engineering Spreadsheets & Presentations
    Replies: 0
    Last Post: 07-08-2013, 06:02 PM
  3. Anode Size Calculation Excel Sheet
    By mbc.engg in forum Mechanical Engineering
    Replies: 0
    Last Post: 12-19-2012, 07:24 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40