Dear All,
I am working on the field that is producing with five wells.
The total field production is obtained from the volumetric meter.
At any given point of time, only one well can be passed through test separator to know its oil rate, GOR and Water Cut.
Based on this, How is it possible to allocate the total field production of oil, gas and water for each of the wells when that well is not passed through test separator?
Is there any method to allocate the oil,gas and water production based on the Flowing Bottom Hole Pressure for the wells?



Reply With Quote

Bookmarks