<

Results 1 to 1 of 1

Thread: drawing this production system

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. drawing this production system

    Two gas wells are producing through individual separators and gas measuring facilities into a single restrictive flow-line leading to the purchaser’s main trunk-line. Condensate production from both wells flows into common tank which has a maximum capacity of 300 bbl. The sales line capacity is 4 MMSCF/day ,and the capacity of each separator is 2.5 MMSC/day .
    ÇÎæÇäí ÇáÇÚÒÇÁ åá ããßä ÑÓã ÊæÖíÍí ááãäÙæãÉ ÇÚáÇÉ áÇäì ÇÑíÏ Úãá ÈÑäÇãÌ ÊÍÞíÞ ÇáÇãËáíÉ ááãäÙæãÉ æÇÑíÏ ÊÕæÑ áåÇ
    æÌÒÇßã Çááå ßá ÎíÑ
    Last edited by husseina78; 06-29-2007 at 01:35 PM.

Similar Threads

  1. Looking for Petroleum Production System (2nd Edition)
    By lizdragon in forum Oil And Gas Production
    Replies: 12
    Last Post: 08-28-2017, 03:16 AM
  2. Api series 17 - subsea production system
    By Achmad Nur Eddin in forum Oil And Gas Production
    Replies: 12
    Last Post: 06-01-2017, 05:39 PM
  3. petroleum production system, Second edition
    By selfcolor in forum Oil And Gas Production
    Replies: 3
    Last Post: 09-16-2014, 08:58 AM
  4. Request API Series 17 : Subsea Production System
    By Achmad Nur Eddin in forum Oil And Gas Production
    Replies: 4
    Last Post: 06-05-2014, 02:13 PM
  5. Share the system to manage PIPE inspection with drawing image.
    By wcjung94 in forum Petroleum Refining
    Replies: 0
    Last Post: 05-30-2013, 08:38 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40