we are going to drill a new vertical well wich is spaced about 600 m about the existing producer (producing at 9m3/hr with cummulative production of 260000 m3)* we have only DST data for this well (no pressure data after 3years of production)* the kh was about 160mdm (vertical homogeneous acting radial flow).we are dealing with tight reservoir* some drilled wells in this area has kh smaller than 30mdm and others greater than 100 mdm(nearest producer kh=160mdm)
I found my scaping too small*
I need hand calculation to confirm if I will interfere with the existing producer then I will drop my reservoir pressure below Pb quickly
please any precious help



Reply With Quote

Bookmarks