<

Results 1 to 2 of 2

Thread: Back allocation

  1. #1

    Back allocation

    Hello all,

    Can someone help and explain to me how to make daily back allocation, weekly back allocation and monthly back allocation using the well test parameters.

    Thanks

    Dunfy

  2. # ADS
    Spons Circuit
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Re: Back allocation

    read this thread:

    [link Point to another website Only the registered members can access]

    For quick calculation:

    let's say we have 3 wells, the latest testing rate of each like A1(200bpd), A2(100bpd), A3(300bpd) => the sum of all the test rates is (200+100+300=600bpd), however,the actual rate we got from the 3 wells was (550bpd).

    Allocation Factor, AF= (Total actual rate / Total test rate) = 550/600

    the allocated rate for each well is:
    A1=(550/600)*200=183bpd
    A2=(550/600)*100=92bpd
    A3=(550/600)*300=275bpd

    Last edited by petengr; 05-19-2013 at 10:27 AM.

  4.    Sponsored Links



    -

  •   

Similar Threads

  1. SIL allocation tools
    By livorno in forum Safety And Environment
    Replies: 0
    Last Post: 07-13-2014, 12:17 PM
  2. Production Allocation Method
    By aanzola in forum Oil And Gas Production
    Replies: 6
    Last Post: 09-05-2010, 04:05 AM
  3. back-to-back test for speed increased gear box
    By giova70 in forum Mechanical Engineering
    Replies: 1
    Last Post: 03-22-2010, 07:14 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •