<

Results 1 to 3 of 3

Thread: Risk acceptance and tolerability

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Risk acceptance and tolerability

    Risk analysis is often used in combination with risk acceptance criteria, as inputs
    to risk evaluation. The criteria state what is deemed as an unacceptable level
    of risk. The need for risk-reducing measures is assessed with reference to these
    criteria. In some industries and countries it is a requirement in regulations that
    such criteria should be defined in advance of performing the analyses. Two main
    categories of quantitative risk acceptance criteria are in use:

  2. #2

    Re: Risk acceptance and tolerability

    So what is the purpose of this thread???

  3.    Sponsored Links



    -

  4. #3

    Re: Risk acceptance and tolerability

    To click on one of two advertisement. They both lead to same place.

Similar Threads

  1. Rig acceptance check list
    By scipiond in forum Drilling And Workover
    Replies: 4
    Last Post: 06-12-2017, 06:13 PM
  2. NF EN ISO 11666 - 2011 Acceptance Level for UT
    By barakkuda in forum Mechanical Engineering
    Replies: 4
    Last Post: 08-28-2014, 11:28 AM
  3. Request Standards for material acceptance
    By vbxxl in forum Materials Science &Corrosion
    Replies: 0
    Last Post: 12-13-2013, 07:14 PM
  4. Article: Risk acceptance and tolerability
    By guhan.s.s in forum Home Articles
    Replies: 0
    Last Post: 09-27-2013, 04:52 AM
  5. Article: Need Help for Risk Analysis with DNV's Phast Risk Software
    By Sanjay kumar G R in forum Home Articles
    Replies: 1
    Last Post: 04-10-2012, 07:35 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40