I will be be very grateful if some one in the house can explain where field weld and field fill weld should be placed on pipe isometrics.
Regards to all.
I will be be very grateful if some one in the house can explain where field weld and field fill weld should be placed on pipe isometrics.
Regards to all.
You shall be take someone points If is Shop welds, transport, installation and others shall be going to the plant (FIELD)
you need to look at where the installation is in the feild i.e access points/ turns/elevations then leave site closures at these critical points.
e.g. install the straight lengths in the piperack then when it turns or a bend is in place just do a site measurement give this to the fabricator then the spool will be fabricated and you know that it will fit.
leaving ffw is the best way to ensure that the installation goes without any cock ups.
regards
as i known in isometric i did shop weld and field weld is all depends upon trasport, and installation....can u please tell what is mean by ffw(field fill weld)?
thanks in advance
FFW means a field fit weld that is a onsite weld to ensure correct fitment