Now We can access Petroleum Community by domain www.petrolcom.net______________ website new domain www.petrolcom.net
Page 1 of 2 1 2 LastLast
Results 1 to 12 of 24

Thread: I have an idea.

  1. #1

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts

    I have an idea.

    I have an idea*I hope it find support.

    Every engineer will tell us about the problems that face him in the field(drilling*production*workover*operation and so on)and how he solve that problem.

    Practical problems and its solution can't be learned from books*only from the field.

    So he can benefit the others especially students like me.
    I hope to find support for my idea.

    El Sayed Raafat
    4th year*petroleum engineering dep.*Suez*Egypt.
    spower2free@yahoo.com



    › See More: I have an idea.

  2. The Following 3 Users Say Thank You to spower For This Useful Post:

    donya (11-24-2012), Shanika (10-16-2013), zanlog (11-26-2014)

  3. # ADS
    Spons Circuit advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     
  4. #2

    Join Date
    May 2009
    Posts
    20
    Thanks
    0
    Thanked 0 Times in 0 Posts
    great idea really i appreciate. I hope not only about problems* we should be discussing abt various engineering aspects and methods on different different fields. I hope if we have something like online plae or live chat that would be better.

  5.    Sponsored Links



    -

  6. #3

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts
    Thank you jayantasm2003 for attention.
    I hope so too.
    we need engineers who have experience to help us

  7. #4

    Join Date
    May 2008
    Posts
    561
    Thanks
    0
    Thanked 102 Times in 40 Posts
    essalamo ala man itabaa elhoda

    I work for a drilling company and I'm 9 years experience in drilling equipment

  8. The Following 2 Users Say Thank You to BOUGHELOUM For This Useful Post:

    donya (11-24-2012), Shanika (10-16-2013)

  9. #5

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts
    wa alikoum elsalam arahmat allah.

    you are welcome BOUGHELOUM

    we want you to tell us about the problems that face you while drilling.

    I hope to chat with you on E-mail

  10. #6

    Join Date
    May 2008
    Posts
    561
    Thanks
    0
    Thanked 102 Times in 40 Posts

  11. #7

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts
    where are the experts?!!!!
    There are a lot of books but I want someone who works in the field to tell me more.
    I am waiting for engineers who have experience.

  12. #8

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts
    where are the experts?!!!!
    There are a lot of books but I want someone who works in the field to tell me more.
    I am waiting for engineers who have experience.

  13. #9

    Join Date
    Jan 2009
    Posts
    10
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Hi

    Hi* I'm a student of P.E. too* of 5 year. It's a great idea but I advice u that you need to live this xperiences personally* because learning by web is useful but is nothing compared with field xperiences. Of course missing n falling first times.
    I've a little xperience* 4 months with British Petroleum* but I feel that it are equal in importance with my 5 years at University. Try to enter in a major company or a services company before graduating* good luck with your career.

    Regards


    PD: Also you can try with SPE's E-Mentoring program

  14. #10

    Join Date
    Aug 2008
    Posts
    316
    Thanks
    21
    Thanked 32 Times in 22 Posts

    Replu: I have an idea.

    I would recommend you to become SPE member and you can subscribe to SPE TIG (Technical Interest Group). A lot of people asked questions about their experience in their fields and many experienced hands replied how they solved or can be solved.

    You can check SPE TIG here:

    [This link Point to another website Only registered and activated users can see links.]

    Quote Originally Posted by spower

    [This link Point to another website Only registered and activated users can see links.]

    I have an idea*I hope it find support.

    Every engineer will tell us about the problems that face him in the field(drilling*production*workover*operation and so on)and how he solve that problem.

    Practical problems and its solution can't be learned from books*only from the field.

    So he can benefit the others especially students like me.
    I hope to find support for my idea.

    El Sayed Raafat
    4th year*petroleum engineering dep.*Suez*Egypt.
    spower2free@yahoo.com

  15. #11

    Join Date
    Mar 2010
    Posts
    12
    Thanks
    0
    Thanked 1 Time in 1 Post
    greetings*

    This what i faced in Mexico *...

    Drilling @ 8000 ft* 6 1/8" hole* directional tool such Vortex (slb) and mwd set of tool* pdc bit* 220 gpm* 25 ft/hr ROP* 80 rpm* 18Klb WOB* 100 ppm of C1 and C2*....once we finish to drill one drill pipe stand and after circulate for 5 mins* shut the pumps to conect the next drill pipe stand* the drilling crew and mud logging unit detected an increase in the flow returns (with the pumps off!!) in the flow line and shale shakers. Inmediately the driller shut the well and register the SICP and SIDPP (with float valve in the string* using a Well control techniques to find out this reading)...as per readins we should increase the mud weight 0.7 ppg higher than the current mud weight. In the past we rised the mud weight to control the possible influx (induce possible fractures and lost circulations)...but that was a real mistake....we found out a problem called BALLONING.....due high mud flows in the well (gpm) and small pressure window (PP* bottom pressure* ECD and fracture pressure was so close!) we induce small fractures while drilling and/or circulating* some drilling mud was lost into the formation (this lost was not properly recorded by the mud logging unit and rig instruments in the mud tanks/flow line) after finish drilling/circulating and shut the pumps off
    * there was flow coming from the well (possible influx) but this mud flowing from the well was approximately the same quantitive of mud lost while drilling!.....after a couple of well with the same behaviour* we decided to decrease the GPM while drilling/circulating to 140 gpm (enough to evacuate the cuttings and cool off the bit) and keep the other drilling parameter*..the result..no more well control procedures for non influx ....

    if anyone wants more information about this problem* just e-mail me...this is a wide subject and deserve more than 10 lines....regards my friends.

  16. The Following User Says Thank You to oscarvargas For This Useful Post:

    Shanika (10-16-2013)

  17. #12

    Join Date
    Apr 2010
    Posts
    15
    Thanks
    0
    Thanked 2 Times in 2 Posts
    Thanks for sharing with us your experience

    Recent Threads by JuanK :


  •   

Similar Threads

  1. Any IDEA for CAESAR?
    By gpp1981uk in forum Pipeline And Fluid Flow
    Replies: 1
    Last Post: 01-23-2014, 08:55 PM
  2. anyone have an idea about LPT? for the Fig Threads
    By tonyliao in forum Mechanical Engineering
    Replies: 0
    Last Post: 08-07-2013, 01:50 AM
  3. Replies: 1
    Last Post: 03-18-2012, 01:49 AM

Visitors found this page by searching for:

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •