Now We can access Petroleum Community by domain www.petrolcom.net______________ website new domain www.petrolcom.net
Page 2 of 2 FirstFirst 1 2
Results 13 to 24 of 24

Thread: I have an idea.

  1. #13

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts
    I think that if the pressure window is too small * then it is better to use managed pressure drilling technique that apply back pressure if the mud pumps are stopped while making new connections.

  2. # ADS
    Spons Circuit advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     
  3. #14

    Join Date
    Sep 2008
    Location
    Egypt
    Posts
    55
    Thanks
    0
    Thanked 17 Times in 7 Posts
    Finally and after five years I become a petroleum engineer.actually semi-engineer

  4.    Sponsored Links



    -

  5. #15

    Join Date
    Dec 2009
    Posts
    64
    Blog Entries
    3
    Thanks
    10
    Thanked 4 Times in 4 Posts
    Yeah great idea* we should have a separate chapter or thread for it...
    add me as a member.
    my email id is nizam_nedian@yahoo.com

  6. #16

    Join Date
    Jun 2010
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts
    thanks for your reply
    i work in drilling company and im material advisor (trainee)
    what u advise me to do to be specialist in drilling equipments.

    plz i need your advise since no body wants to guide me in my company i dont know why ???
    plz ur help needed and will be highly thankfull.

  7. #17

    Join Date
    Jun 2010
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Quote Originally Posted by BOUGHELOUM View Post
    essalamo ala man itabaa elhoda

    I work for a drilling company and I'm 9 years experience in drilling equipment
    thanks for your reply
    i work in drilling company and im material advisor (trainee)
    what u advise me to do to be specialist in drilling equipments.

    plz i need your advise since no body wants to guide me in my company i dont know why ???
    plz ur help needed and will be highly thankfull.

  8. #18

    Join Date
    May 2010
    Posts
    5
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Same Problem

    I am abdulrehman working in Pothowar region Pakistan for last four ears as a drilling engineer...............we have the same problem of balooning. due to abnormally high pressures in this area* we have to drill with very high mud weights (upto 19.5 ppg) and after shutting off the pump* te well starts flwing at high rate and gradually becomes stable after 30-80 minutes depending upon the length of open hole.....I think* Managed pressure drilling is a good technique to cope with this problem.

  9. #19

    Join Date
    May 2008
    Posts
    566
    Thanks
    0
    Thanked 102 Times in 40 Posts
    must know the methods of calculating the rig (mast-drawworks-drill string design......)* and also know the API spec and API RP.

    must know how to establish a drilling program and how to choose a rig.

  10. #20

    Join Date
    May 2010
    Posts
    5
    Thanks
    0
    Thanked 0 Times in 0 Posts
    I can't understand what you have written........the text is either incomplete or something else as it is difficult to understand what you wanna say

  11. #21

    Join Date
    May 2008
    Posts
    566
    Thanks
    0
    Thanked 102 Times in 40 Posts
    download all the books* I just load them* it'll help you

  12. #22

    Join Date
    Jun 2010
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Quote Originally Posted by BOUGHELOUM View Post
    download all the books* I just load them* it'll help you
    hiz man
    which books

  13. #23

    Join Date
    May 2008
    Posts
    566
    Thanks
    0
    Thanked 102 Times in 40 Posts
    All books "Started by BOUGHELOUM"

  14. #24

    Join Date
    Oct 2010
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Drilling in the middle of residential

    All*

    we will conduct drilling activities in the middle of residential* does anybody know how to reduce the effects of heat* noise and illumination from the burn pit ?

Similar Threads

  1. Any IDEA for CAESAR?
    By gpp1981uk in forum Pipeline And Fluid Flow
    Replies: 1
    Last Post: 01-23-2014, 08:55 PM
  2. anyone have an idea about LPT? for the Fig Threads
    By tonyliao in forum Mechanical Engineering
    Replies: 0
    Last Post: 08-07-2013, 01:50 AM
  3. Replies: 1
    Last Post: 03-18-2012, 01:49 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •