    Question Artificial Lift Economics

    Dear colleagues, I need your help to make an economic evaluation comparing continuous gas-lift versus electrical submersible pumps for high PI and high rate producing wells (>6000 bpd). MS Excel sheet showing all the parameters to consider will be of great assistance. Thanks in advance and waiting for your prompt response.
    Petroengineer.

  2. # ADS
    Spons Circuit advertisement
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Join Date
    Nov 2010
    Posts
    2
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Hi Petroengineer, I´m new member in this forum. Do you speak spanish?. Excuse me, my english is not fluent but I will try to help you.

    There are many economical indicators that you can showing in the spreedsheet. Some indicators are the following:

    To gas lift: recovery factor by this method, usefull lifetime, gas comsuption v.s produced net barrels, power compression required v.s produced net barrels, cost of gaslift equipment (mandrels, valves, technical assitences, instrumentations) installing and maintenance, days and cost of completation (head x-max tree, security valves, string, others), flowline and gas lift lines costs (the diameter is not necesary the same of ESP), operations and mantenance cost. Final indicators to economics evaluation NPV and/or IRR.

    For ESP (electrical submersible pumps) Completation: recovery factor by this method, usefull lifetime, power comsuption v.s produced net barrels, cost of ESP equipment (pumps, cables, accesories, Control panel, instrumentations, others) BES installing and maintenance, days and cost of completation (head x-max tree, security valves, string, others), flowline costs (the diameter is not necesary the same of GL), operations and maintenance costs. Final indicators to economics evaluation NPV and/or IRR.


    I hope can I help you.....regards

    Recent Threads by pebraco :


    •    Sponsored Links



      -

    • #3

      Join Date
      Feb 2010
      Posts
      32
      Thanks
      2
      Thanked 14 Times in 7 Posts
      Dear pebraco, thanks for your quick response. I already did the nodal analysis for both gas lift and esp. What I need now is the capex estimate for gas compression, side pocket mandrels, gas lift valves, esp equipment, etc. and opex for both gas lift and esp systems. Any help on this matters will be much appreciated. Thanks again for your help.
      petroengineer

    • #4

      Join Date
      Nov 2010
      Posts
      2
      Thanks
      0
      Thanked 0 Times in 0 Posts
      I apologize, I was out by surgery. The information required for you, I do not have available. I suggest you consult with suppliers for these technologies.

      This depends on sizing completion and only suppliers to know the cost.

      regards

      Recent Threads by pebraco :


      Similar Threads

      1. The Technology of Artificial Lift Methods Volume 3
        By sami22 in forum Engineering Software Tutorial
        Replies: 8
        Last Post: 03-14-2013, 07:08 PM
      2. Selection of best artificial lift method
        By mohsen2396 in forum Oil And Gas Production
        Replies: 2
        Last Post: 04-25-2012, 02:20 PM
      3. The Technology Of Artificial Lift Methods by Kermit E Brown
        By irfan4jaanu in forum Oil And Gas Production
        Replies: 32
        Last Post: 10-09-2011, 08:26 AM
      4. Replies: 24
        Last Post: 01-05-2011, 03:29 PM
      5. technology of artificial lift methods
        By antomepetro in forum Oil And Gas Production
        Replies: 13
        Last Post: 11-12-2010, 10:47 PM

      Bookmarks

      Posting Permissions

      • You may not post new threads
      • You may not post replies
      • You may not post attachments
      • You may not edit your posts
      •