    The foundation of a subsea structure,such as manifold and PLET/PLEM, can be either the mudmat or suction pile.

    If there is already a suction pile, does it need a mudmat?

    I think a suction pile is enough to prevent a subsea structure from sliding or sinking!

    In a word, does a suction pile and a mudmat exist at the same time?

    Any body tells me, thanks in advance~

  2. # ADS
    Spons Circuit advertisement
    Join Date
    Always
    Posts
    Many
     
  3. #2

    Join Date
    Mar 2010
    Posts
    4
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Subsea manifold can be either designed with a mudmat or suction pile, generally according to the conditions of the soils. PLET/PLEM is mostly desinged with a mudmat. I've not seen any PLET with a suction pile on bottom of it. Suction pile is utilized for mooring of PLET subsea unless a 1st end PLET installation method is used.

    Recent Threads by Abolo :


    •    Sponsored Links



      -

    • #3

      Join Date
      May 2010
      Posts
      8
      Thanks
      0
      Thanked 0 Times in 0 Posts
      Quote Originally Posted by Abolo View Post
      Subsea manifold can be either designed with a mudmat or suction pile, generally according to the conditions of the soils. PLET/PLEM is mostly desinged with a mudmat. I've not seen any PLET with a suction pile on bottom of it. Suction pile is utilized for mooring of PLET subsea unless a 1st end PLET installation method is used.
      Thank you very much!

      One more question, what's the mooring of PLET?

    • #4

      Join Date
      Jul 2010
      Posts
      1
      Thanks
      0
      Thanked 0 Times in 0 Posts
      When a pipeline is initiated from a pipelay vessel, a PLET (Pipeline End Termination) sled/structure with the pipeline is carefully lowered towards the seabed from a lay vessel and attached to the suction pile with a cable. This holds the pipeline back while the vessel continues laying the pipeline.

      Recent Threads by gtty :


      Similar Threads

      1. Pile stabbing guide design
        By mikesteel in forum Civil & Structural Engineering
        Replies: 0
        Last Post: 07-07-2014, 01:14 PM
      2. Pile Design and Construction Practice 4th Ed. Tomlinson 1994
        By Nabilia in forum Civil & Structural Engineering
        Replies: 3
        Last Post: 05-22-2013, 10:50 AM
      3. Jack up Rig Leg, pile Penetration Analyzing Software
        By arun25hyd in forum Civil & Structural Engineering
        Replies: 0
        Last Post: 02-12-2011, 09:36 AM

      Bookmarks

      Posting Permissions

      • You may not post new threads
      • You may not post replies
      • You may not post attachments
      • You may not edit your posts
      •