Now We can access Petroleum Community by domain www.petrolcom.net______________ website new domain www.petrolcom.net
Tab Content
No Recent Activity

  1. Sponsored Ads
  2. View Conversation
    I'm sure there are many possible reasons* but the one that jumps out at me immediately would be as follows;

    If you had a situation* where you had a high(er) permeability watered out layer which was preferentially being depleted through production but was connected to an aquifer* over or underlying a lower perm oil zone that supplied the 10% oil* then when you shut the well in* the water zone would recharge pressure meaning (a) other wells connected to the same water zone would see an WC increase and (b) when you put the well back on production you would produce far higher watercuts until you drawdown the water layer to its steady-state pressure again

    Just an idea
  3. Sponsored Ads
Showing Visitor Messages 1 to 1 of 1
About bayan

Basic Information

Statistics


Total Posts
Total Posts
129
Posts Per Day
0.05
Last Post
QC for Static and Dynamic models 08-06-2017 10:57 PM
Visitor Messages
Total Messages
1
Most Recent Message
08-27-2011 04:02 PM
Total Thanks
Total Thanks
1
  • Thanked 13 Times in 10 Posts
Projects
General Information
Last Activity
11-18-2017 06:03 PM
Join Date
11-27-2010
Referrals
0

3 Friends

  1. busheler  busheler is offline

    Senior Member

    busheler
  2. DAH7542  DAH7542 is offline

    Active Member

    DAH7542
  3. FOXNEW  FOXNEW is offline

    Member

    FOXNEW
Showing Friends 1 to 3 of 3

Quizzes I've Taken

    • N/A
    • bayan has not taken any quizzes.

Quizzes I've Created

    • N/A
    • bayan has not created any quizzes.